Adani Power Limited
General Updates
01 / The disclosure
What the company shared
Adani Power Limited has informed the Exchange about Letter of Award
A question for your research
Check disclosed contract value, customer, execution timeline and conditions. Compare the order with existing revenue and the order book.
Numbers found in document text 2 matches
Automatic text matches, not verified financial metrics. A match may come from a table heading or reporting year. Expand it to inspect the surrounding text and original page.
1,234 MWPage 2
Nature of order(s)/contract(s) Long term ex-bus net supply of 1,234 MW (1,320 MW installed capacity) of thermal power.
View source page1,320 MWPage 2
Nature of order(s)/contract(s) Long term ex-bus net supply of 1,234 MW (1,320 MW installed capacity) of thermal power.
View source pageThe evidence
Read the source excerpts
01Name of the entity awarding the order(s)/contract(s) Uttarakhand Power Corporation Limited (“UPCL”) 2.
Page 2
02Significant terms and conditions of order(s)/contract(s) awarded, in brief As per the provisions of the tender floated by UP CL and subject to the conditions stated in the instant LoA.
Page 2
03Whether order(s)/contract(s) have been awarded by domestic/international entity Domestic Entity 4.
Page 2
04Nature of order(s)/contract(s) Long term ex-bus net supply of 1,234 MW (1,320 MW installed capacity) of thermal power.
Page 2
05Time period by which the order(s)/contract(s) is to be executed The power supply under the PSA will be for a period of 25 years. 7.
Page 2
Source & verificationView the disclosure trail
- Summary method
- Exchange-provided text; no generated financial figures
- Exchange identifier
- 106816853
- First collected
- 14 Oct 2026, 11:12 IST
- PDF extraction
- extracted · 2 pages read
- Extraction note
- Source excerpts; financial tables have not been validated.
- Document SHA-256
- ecbb19ce10e0caa7ae941a4fecb9780c323d352472ae9e5309b495d21c614077